Read about our architecture/construction management firms:
TMP Architecture
and
AVB Construction /
Triangle Associates
Questions about our projects? Contact Community Relations
Manager Tom Vance at
tvance@portageps.org or at 323-5167.
- The school, which opened in time for the
2009-2010 school-year, now has a
four-classroom addition that brings it
back into line with the original design (and identical to
the new Lake Center Elementary). A sidewalk is also being
completed on the west side of 12th Street in time for the
new school year.
- Check out the 12th Street
website.
- This $14.8 million school (which
includes $1.4 million in technology) is a two-story,
72,900 square feet school, with a capacity of
approximately 500 students.
- The school was designed to meet or
exceed current 'green,' or sustainable design, standards
for energy-efficiency, occupant comfort and air-quality.
Materials used were selected for recycled content, future
recyclability, low volatile-organic-compond, durability
and ease of maintenance.
- The new school is done
in time for this school year, and the public dedication and
Open House is Sept. 9, 4:30 to 7 p.m., featuring tours and
refreshments with a dedication ceremony at 5:30 p.m.
The overall design is the same as 12th Street Elementary.
See the
current site plan.
The new school is being built behind the existing school
(our oldest school, dating from 1927).
- Improvements have been made to
traffic flow on Portage Road in front of the school.
- See a
current picture
of the new school.
- See conceptual drawings from the
west and the north,
and the site plan..
Construction is ongoing behind the school. The new school
will be completed in time for fall 2011.
- This is three-story construction. See a
current picture of the project.
Mustang Drive is the new entrance to the new student
parking lot off Centre Avenue, that will be ready in time
for Sept. 7, the first day of classes. Students will no
longer be parking in the McCamley lot off Westnedge.
- Ground-breaking ceremonies were held on
May 22, featuring retired PPS superintendent Varl
Wilkinson, who was superintendent when Central High was
built in 1949.
- Web cam:
http://portagecentral.triangle-inc.com.
- Some classes, impacted by the
construction, are being held at the old Waylee.
See a picture of students walking to and from Waylee.
- This project is both new construction and
renovation. The Media Center has been renovated, a new
Science Wing has been completed, and the
Commons will be ready for the new school year, built
between the main part of the school and the Igloo.
- See a
picture of the current progress for the Student
Commons. There will be a public
dedication and Open House on September 20, from 4:30 to 7
p.m., featuring tours and refreshments, with a dedication
ceremony at 5:30.
- See conceptual drawings from the
south (main entrance) and
north (student entrance).
Site plan.
- The Idaho/Oregon intersection has been
improved and parking lot improvements are complete.
Click here for a new site map
- See this link
for three levels of interior designs and front and back site
graphics.
- Web cam:
http://portagenorthern.triangle-inc.com
- Construction and renovations will be
complete by fall 2011.